In 2019, CableRunner-USA designed and installed a Pilot fiber optic system with the CableRunner technology. The 10,304’ project route begins at Dallas City Hall ending at the Transportation Center. The route included 5 lateral drops to Traffic Control cabinets. The Outside Plant project included the CableRunner systems Accessible and Non-accessible, Micro-trenching, trenching, boring, and aerial plant. The process included pre-installation video survey of the storm sewer system and power flushing of the sewer system and post installation video survey.